Skip to content

0.10.0-S09: Security and privacy audit refresh #476

Description

@mberrys

Session 0.10.0-S09 · type qualification · milestone 0.10.0 — Platform Hardening, Extension Ecosystem & 1.0 Readiness

GA preparation. All graduated-automation stages hardened.

Delivers

Security/privacy audit refresh: threat model, encrypted stores, provider data policy, fuzz budgets.

Scope and ownership boundary

  • This session owns: One hostile/scale/platform lane with budgets.
  • This session may not: Feature work.
  • The milestone must not create: new product-scope features hiding as "hardening", a web shell, or a second language runtime.
  • Out of scope for the milestone: New capability families; anything that widens authority boundaries.

Tasks

  • Refresh the threat model across the shell, sidecars, plugins, and encrypted stores.
  • Review the provider outbound-data policy.
  • Refresh the fuzz budget and re-run the corpora against it.
  • Produce the audit report.
  • Triage every finding to a fix or an explicitly accepted risk on the record.
  • Produce the session handoff packet (exact SHA, changed files, tests run, deviations, remaining risks) — the only valid inter-session interface.

Dependencies

Parallel lanes

Sanctioned parallelism for 0.10.0: S02/S03 after S01; S05/S07/S08 as independent lanes; S09 after S03 and S07.

Lanes run concurrently only where the session map marks them; concurrency outside the sanctioned lanes is not permitted.

Exit evidence

Audit report produced; findings triaged to fixes or accepted risks.

PR titles, commit messages, and document headlines are never acceptance evidence. Only this session's exit evidence, on an exact SHA, closes this gate.

Milestone context

Objective. Declare and freeze the 1.0 public contract surface (CLI envelopes, persisted schema kinds, plugin capability ABI, documented behaviour) with a deprecation policy; ship the versioned plugin SDK with admission policy and threat review; run the performance/scale program on named benchmark identities; harden distribution (signing procurement decision, update channel, SmartScreen exit); decide macOS explicitly; refresh the security/privacy audit; complete operator documentation; and assemble the 1.0 readiness dossier with release-candidate criteria demonstrated on an exact SHA.

Stop rules. A contract that cannot be fixture-frozen is redesigned or labelled experimental - never silently promised. Scale/performance failures block the release candidate; missing platform evidence is unavailable, not PASS.

Authoring note

Per the rolling-wave rule in section 7 of the roadmap, the fully executable specification for this session (exact starting SHA, allowed layers and files, components to reuse, named tests, escalation conditions) is authored when the milestone activates, after its S00 reconcile. This issue carries the fixed frame — objective, boundary, dependencies, and exit evidence — and is refined, not replaced, at activation.


Full context: docs/ROADMAP_0.5.0-0.10.0.md section 4.6 and docs/github-milestones/0.10.0.md.

Activity

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

No one assigned

    Labels

    No labels
    No labels

    Type

    No type

    Projects

    No projects

      Relationships

      None yet

      Development

      No branches or pull requests

      Issue actions