Repository navigation
fix(progress-report): polish counts, stage 0 pending, calm no-log line - #454
Merged
Merged
Conversation
- "done <date>" in a build-plan.md State cell counts as built in the plan
parser, so the Stage 5 card, the plan header and the phase badge agree
("not built" is still checked first).
- A placeholder gate-check failure on a stage after the current one reads
PENDING instead of FAIL.
- The no-session-log notice is one calm line; the regenerate hint moves
into the collapsed "How this was measured" block, and --no-log never
claims it looked in folders.
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
…choice Module done runs the per-flow unit tests chosen at CAC-5 (listed in the module brief), not "unit tests when switched on". Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
MendixMau
added a commit
that referenced
this pull request
Oct 16, 2026
…s, unit flows in the Module done row Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
This file contains hidden or bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
Add this suggestion to a batch that can be applied as a single commit.This suggestion is invalid because no changes were made to the code.Suggestions cannot be applied while the pull request is closed.Suggestions cannot be applied while viewing a subset of changes.Only one suggestion per line can be applied in a batch.Add this suggestion to a batch that can be applied as a single commit.Applying suggestions on deleted lines is not supported.You must change the existing code in this line in order to create a valid suggestion.Outdated suggestions cannot be applied.This suggestion has been applied or marked resolved.Suggestions cannot be applied from pending reviews.Suggestions cannot be applied on multi-line comments.Suggestions cannot be applied while the pull request is queued to merge.Suggestion cannot be applied right now. Please check back later.
Small polish on the progress report, from a review of a fresh and an updated neutral demo project.
done <date>now counts as built in the plan parser (build-plan-status.sh), so the Stage 5 card, the plan header and the phase badge agree. "not built" is still checked first. The updated demo went from "3 built, 1 cannot read, Phase 2 unknown" to "4 built, Phase 2 in progress", matching the card's "4 of 6".--no-lognever claims it looked anywhere. No new sections.Tests: new tests/wave2/test-progress-report-polish.sh (done-row agreement, stage-after-current PENDING, no-log line and
--no-log, CAC-5 wording); the old banner assertions in test-progress-report.sh and test-progress-report-field-fixes.sh are updated. test-progress-report*.sh, test-build-plan*.sh, check-portability.sh and check-pr-discipline.sh are clean.Before and after screenshots at 1440 px are in /tmp/polish-out/ on the author's machine.
🤖 Generated with Claude Code