Skip to content
OpenEVSEPublic

About

No description, website, or topics provided.

Resources

Stars

2 stars

Watchers

0 watching

Forks

Latest commit

 

History

11 Commits

Folders and files

NameName
Last commit message
Last commit date
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Repository files navigation

OpenEVSE Guides

Assembly, setup and troubleshooting guides for OpenEVSE charging stations, in Markdown.

Each guide has its own folder with a README.md, an images/ directory and, where the guide had attachments, a documents/ directory.

PDF downloads: every push to main rebuilds a PDF of each guide and attaches it to the latest release. To build them locally, run scripts/build-pdfs.sh (needs pandoc and Chrome).

Guides

OpenEVSE Charging Stations

Guide Difficulty Time
Current - v6.5.1 OpenEVSE Advanced Moderate 30 min – 2 hr
Discontinued June 2016 - v4 OpenEVSE 30A Basic Moderate —
Discontinued June 2016 - v4 OpenEVSE 30A Deluxe Moderate 2 hr – 3 hr
Discontinued May 2018 - v4 Advanced Moderate 45 min – 2 hr
Discontinued May 2018 - v4 Standard Moderate 1 hr – 2 hr
Discontinued May 2019 - v5 Standard Moderate 15 min – 1 hr

General

Guide Difficulty Time
Mounting Your Charging Station Easy 15 min
OCPP Setup Pulse Energy Moderate —
Quick Start Guide Very easy 15 min
WiFi - Join Network Easy 5 min

JuiceBox

Guide Difficulty Time
Replace Controller in Juicebox v1 Easy 15 min
Replace Controller in Juicebox v2 Easy 15 min

OpenEVSE Kits

Guide Difficulty Time
How to Build OpenEVSE EV Simulator v2 Easy 5 min – 10 min
How to Build OpenEVSE Plus Easy 10 min – 15 min
How to build OpenEVSE LCD kits Easy 15 min – 20 min
OpenEVSE P50D-WV kit alternate build guide Moderate —

Components

Guide Difficulty Time
How to Build a GFCI coil with self test Easy 10 min – 15 min
How to Build a lit push-button Easy 10 min – 15 min

EV Cables

Guide Difficulty Time
How to build SAE J1772 cable assembly Moderate 40 min
How to build an IEC - Type 2 Mennekes Cable Moderate 30 min

OpenEVSE Communications

Guide Difficulty Time
How to Load OpenEVSE Firmware (WinAVR) Easy 5 min – 10 min
Serial Communications with OpenEVSE Moderate —
Upgrade OpenEVSE Plus V4 Firmware with Arduino Moderate 1 hr – 2 hr

Troubleshooting

Guide Difficulty Time
Relay Maintenance Easy 30 min
Testing Basic and Advanced Moderate 20 min

Warning

OpenEVSE assembly involves AC voltages from 100 to 250 V. If you are not experienced with AC wiring, have an electrician assist with and inspect your work.

About

No description, website, or topics provided.

Resources

Stars

2 stars

Watchers

0 watching

Forks

Releases

Packages

Contributors

Languages