release: prepare CraftDAG v0.2.7 - #121
Conversation
|
Release structure looks correct overall: core 0.2.7 is bumped consistently, adapter-mesh is packed/published after core, the packed workspace dependency was verified as core 0.2.7, and CI is green. There is one release blocker: The exporter/importer runtime-version fixes will not actually be published. This PR changes:
But the publish workflow intentionally runs Please use the clean release path:
The repository tag can still be v0.2.7; these package versions have historically been staggered. Then verify the four packed manifests:
and rerun the normal validation. Everything else in the current release PR looks ready; no product-feature changes are needed. |
|
Final release review of head
I do not see a remaining blocker. This release PR is ready for the normal human merge decision. After merge, create/tag
No further release-code changes are needed before merge. |
Summary
Validation
pnpm build,pnpm test(218 tests),pnpm typecheck,pnpm lint, andgit diff --checkpassed.pnpm packproduced core 0.2.7, adapter-mesh 0.1.0, exporter-schem 0.2.6, and importer-schem 0.2.5 tarballs.@i365dev/craftdag-core: 0.2.7.