Skip to content

Interop and Video pass on main - #8347

Draft
kixelated wants to merge 6 commits into
mainfrom
quest/m0/interop-green/README
Draft

kixelated wants to merge 6 commits into
mainfrom
quest/m0/interop-green/README

Conversation

@kixelated

@kixelated kixelated commented Nov 9, 2026 •

Copy link
Copy Markdown
Collaborator

Claims quest/m0/interop-green/README.md.

Summary

Triaged the latest scheduled Interop run, 42491651687 (2026-11-08, at e2271ba). Both failing steps come from the JS lite-07 route wire, which Rust moved to and JS has not ported, so neither is a flake. They are owned by routes/js.md. moq-dev/moq#8290 already skips them on main.

  • Datagram tracks: datagram_tracks_javascript times out in its first case, and it fails every time on main's content.
  • Media output and lifecycle: chromium's replacement case crashes both moq-lite-07-wip pages with page crashed, and it fails every time on main's content when run explicitly.

No code or test changes. The quest README records the triage and the decision below.

Checks

  • quest check: passes.
  • just check: passes.
  • On main's content, just test media passes with replacement quarantined.
  • On main's content, just test datagram-tracks still fails, as expected until the port lands.

Decisions

  • Quarantined nothing new. The two failures are the known route-wire gap, so the disable-and-plan rule in AGENTS.md is already met by fix(ci): repair nightly tooling and skip pending JS route lanes #8290.
  • Maintainer, 2026-11-09 (AFK, accepting the recommendation): close this quest on a scheduled Interop pass with the datagram and replacement cases skipped, since routes/js.md tracks restoring them.

Waiting

  • moq-dev/moq: a scheduled Interop run on main passes. Check with gh run list --repo moq-dev/moq --workflow interop.yml --event schedule. This PR stays a draft until that pass, then the quest is deleted.

🤖 Generated with Claude Code

(Written by Haiku 5.5)

kixelated and others added 6 commits November 7, 2026 08:15
…enamed buffer

Scheduled Interop run 42382888974 failed only on this stale case.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Run 42491651687 failed two steps. Both come from the JS lite-07 route
wire, which Rust moved to and JS has not ported, so neither is a flake:
the datagram test fails on main's content, and the media replacement
case crashes its pages. #8290 skips both, and the scheduled
wait now says so.

Co-Authored-By: Claude Haiku 5.5 <noreply@anthropic.com>
…ses skipped

The maintainer accepted the recommendation while AFK: a scheduled Interop
pass with the datagram and replacement cases skipped closes this quest,
since routes/js.md tracks restoring them.

Co-Authored-By: Claude Haiku 5.5 <noreply@anthropic.com>

This branch has not been deployed

No deployments
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant