test(ui-react): await completion before snapshot assertions - #1961
Conversation
|
Complexity review applied in #1961 at Fresh native restoration proof: 4 cases / 43 assertions, 77.94 seconds wall / 91.20 seconds CPU / 1246872 KiB peak RSS; strict types pass (28.61 seconds), committed preflight 54 / 181 (5.14 seconds), citation checks 44 / 113. All 14 frozen source/config identities match d7, whose test and fixture are restored byte-for-byte. Historical faults retain their recorded source identity; no unchanged failed suite was retried and no new matched speedup is claimed. #1961 stays draft; #1915 still blocks complete qualification and merge. The three restored windows are existing proof, not justified minimum horizons, and #1855 remains open. The current issue/PR bodies now reflect this scope and preserve the historical controls. Claim |
|
Resumed #1961 at Fresh actual terminal-policy mutation fails the original quiet-history streaming assertion (0 / 1 / 11), then restored native helper plus snapshots passes 4 / 48. Strict types, committed preflight 54 / 181 and citations 44 / 113 pass. Timed native/type/preflight cost: 174.86 seconds wall / 245.99 seconds CPU; no new matched speedup is claimed. The reviewed head is ready for fresh complete selected hosted qualification, including all 14 continuity cases. #1993 remains separately open; no unchanged failed job was retried. The original final 500 ms windows and broader #1855 obligations remain. Claim |
Qualified candidate — 2026-10-15Ready run 38795496667, attempt 1, passes all 13 selected jobs, including the aggregate. Packaging is intentionally unselected for this tests-only contribution. Every executed job checkout log identifies Unit job 116630958542 passes all 14 continuity cases, including the four new late-history cases, all three snapshot races, both ten-drop paths and both IME paths. The unchanged ten-minute endurance scenario passes in 603.539 seconds. Total executed CI job-wall cost is 8,134 seconds, event-to-completion 1389 seconds; the preceding cheap draft run adds 49 job-seconds. Separate project/contract workflows are outside that accounting. These are qualification costs, not matched performance gains. Main then advanced independently through #1963 to |
Actual main verification — 2026-10-15#1961 is merged as Automatic push run 38798781662, attempt 1 passes all 13 selected jobs, including the aggregate. Every executed checkout log identifies that exact squash. Packaging is intentionally unselected for this tests-only delivery. Unit job 116642311946 passes all 14 continuity cases, with the exact same named set as ready qualification. All original product assertions, late-history cases and retained final observation windows remain. Layout job 116642311865 passes the unchanged native endurance case in 604.257 seconds: 588 chunks, 9,665,247 bytes, saved through 599.765 seconds and decoded duration 599.699977 seconds. Main validation consumed 7,842 summed job-wall seconds and 1,487 seconds from event creation to last job completion. The separate ready run cost 8,134 job-seconds / 1,389 event seconds, and its preceding cheap draft cost 49 job-seconds: 16,025 executed CI job-seconds for these three events. Separate contract/project workflows, local commands and engineering time are excluded. The four newly timed local fault/restoration/type/preflight commands cost 174.86 seconds wall / 245.99 seconds CPU. These are verification costs; neither different-source CI timings nor the integrated restoration run is a matched speedup experiment. Historical per-slice gains and rejected-study costs retain their original identities in the PR. This completes the partial four-slice delivery. #1855 stays open for justified remaining temporal horizons and its #1956/#1854 dependencies. The fifth observer remains withdrawn, with its original evidence preserved. The fresh main pass does not diagnose or waive #1993's separate #1962 qualification failure. No failed job was retried and no merged branch was pushed. PR and advanced issue retain milestone 0.44.0 (58); the issue is open and unassigned. |
Refs #1855
#1915 is closed through merged #1979 (
cbf2bb87). The integrated candidate has passed complete selected qualification; actual main verification is recorded separately.What changed
Four snapshot preparation slices replace guessed delays with the actual old host-turn completion, current draft acknowledgement and held reconnect-read admission, newer-turn resync, and finite rendering after the original offline/status/banner checkpoints. They preserve streaming, retained nodes, focus/selection, draft text and no extra chat sends. Every scene window and the three original final snapshot 500 ms windows plus frame pairs remain.
The fifth selection/publication slice is withdrawn after the authorized complexity review. Commit
16792162caddaf6ba7de50d9ea5a009792aa5c37removes 177 net test/fixture lines, including the 127-line observer, and restores the runtime test and fixture byte-for-byte to measured candidated7b103937529f8880bac17fd894f6e3043c85c42. The guide explains the rejection; all five immutable study artifacts remain unchanged. No product, public seam, timer configuration or contract changes; no changeset is needed.Why retain four slices and reject the fifth
At its recorded historical source, the old-slot boundary fixes a real setup race: the UI result precedes asynchronous host finalization. With a 2000 ms actual finalization hold, the original and omitted-boundary controls fail the original captured-old-turn assertion; the completion boundary passes. Draft/resync acknowledgements and finite-render preparation retain the existing product oracles and original final observations.
The rejected observer proved a stronger fixture-specific completion boundary, including native selected-context commit and its associated publication. Its publication/error omission controls failed added diagnostics before the original product assertions; cancellation failed the added readiness gate. Both original and candidate detected the exercised terminal-policy regressions. This does not demonstrate additional product regression detection from the observer. Its coupling to partition callbacks, context keys, fork counts, exact
status.setStatepublication shape and an escaped-stream branch is disproportionate to the demonstrated benefit. Restoring the original windows preserves existing proof; it does not establish that 500 ms is a sufficient minimum or resolve the remaining wait-design criterion.Current integrated candidate
Head
76d7b1d338fc7602dd41b1d81ad14ce74b047b4emerges maind9ac37b82700d7b45406ba47c0850ae46251fa9binto the reviewed withdrawal head16792162c. #1979's animation/focus correction and #1968's history-freshness behavior are included. Merge conflicts were resolved by retaining both main's lifecycle diagnostics and this PR's preparation observations, and both wait-guide sections. No production source differs from main. The rejected selection observer stays removed; all five historical artifacts are byte-identical to the withdrawal commit.Main now publishes the current turn after asynchronous history reads; its current-turn identity assertions and four stale/fresh queued-history cases are retained. Static AST review confirms all 71 main matcher expressions remain in order (75 in the integrated test), and the four new late-history case definitions are byte-identical. The old captured-turn mutation is historical evidence for the old server policy, not current mutation proof. The old-slot boundary still explicitly finishes the original slot before the peer starts its successor. Final and scene observation windows remain.
Fresh source-bound proof, with actual browser, mandatory build, original preload and verified loopback-only ordinary-UID namespace:
SESSION_LOAD_ERRORhandler: the quiet-history case fails its original streaming assertion, expected true / received false, after the retained 500 ms observation. 0 pass / 1 fail / 11 assertions, 13 unrelated cases filtered. Cost 59.34 s wall / 91.57 s CPU / 1242788 KiB peak RSS. Production source is restored and verified.bun run check:pr --base origin/mainpasses 54 / 181, including lint/leakage and metadata gates (5.68 s). Citation proof passes 44 / 113 against the same final document bytes. The four timed native/type/preflight commands cost 174.86 s wall / 245.99 s CPU. Citation and engineering time are not included. Private-cachebun install --frozen-lockfile --backend=copyfilereports no changes, 192 ms; mutable dependencies are not shared.Fresh hosted qualification passes the entire 14-case continuity file and every other selected category, with exact source identity below. #1993's earlier main-push Playwright channel-object failure remains separately open and actively investigated; neither this local pass nor the later passing #1968 main run diagnoses it. No unchanged failed job was retried.
Historical withdrawal proof
Reviewed head:
16792162caddaf6ba7de50d9ea5a009792aa5c37, parent18451a1a252cddc2c6e9b121a0a2942dd6dbf201; branch integration base remainsc95223333a83fd3049749a2e68fb0c07963b7ba5. Current-main comparison for preflight was9274b8a06; this is not a claim that later main is integrated.tsc --noEmitpassed, 28.61 s. Committedbun run check:pr --base origin/mainpassed 54 tests / 181 assertions, 5.14 s, including lint/leakage and affected metadata/invariant gates. Citation tests passed 44 / 113, 0.63 s. These four validation commands consumed 112.32 s wall / 148.31 s CPU in total; engineering time is not included. Dependencies were installed into a private cache using copyfile, 33.85 s, without sharing mutable dependencies.Retained historical measurements
These are separately measured changes under uncontrolled shared-host load. Gains are not additive and do not establish a whole-file or whole-CI speedup. Full sources, counters, controls, overhead and failed attempts remain in the immutable artifacts linked by the wait guide.
Rejected fifth study — evidence retained
Historical source
18451a1aadded 177 net lines, including a shared 127-line observer, to change the equal-selection helper-plus-three-case result from 4 / 43 to 4 / 49. Bodies were 30.08234 → 29.36794 s (0.7144 s lower), command 79.69 → 78.83 s, setup 48.76674 → 48.61535 s, CPU 93.82 → 93.49 s, and peak RSS 1231080 → 1249220 KiB (+18140 KiB). Three fixed windows totaling 1501.63 ms became three completion boundaries totaling 774.26 ms. These historical observations are not benefits claimed for the restored candidate.The immutable selection artifact still indexes 429 receipts, including real postcommit and failed-resume holds, omissions, cancellation and terminal faults. The first error mutation failed a different original retained-node progress assertion; its checker rejection and 128.35 s cost remain preserved. New native command costs were 322.24 + 128.35 + 332.68 = 783.27 s, excluding engineering/static-check cost; historical controls were reused without charging them again. All three final lifecycle snapshots still had later work pending, so this was never global quiescence. The rejected source remains in commit history; its artifact is not a current-source claim.
Historical hosted qualification
The following earlier failed or cheap draft receipts retain their original source. No unchanged failed full suite was retried; fresh qualification of the integrated candidate is separate.
Historical ready run 38675664808 tested earlier head
df635ea1, without the later resync/recovery/drop work. Eleven selected jobs passed; browser (2) and aggregate failed #1915. All 13 executed checkouts were verified ase98c895f566f18895e530651562a64420e75a07b; cost was 7288 job-seconds / 1346 s event wall. The ten-case continuity file passed then, but that is not current-head qualification.Prior cheap draft runs 38688865485 and 38700382135 passed their two executed gates at d7 and 184 respectively, with 46 and 45 summed job-seconds. Their expected draft skips did not supply full qualification. #1975 was subsequently superseded; #1979 delivered the #1915 correction and that issue is now closed. Its failure history is not relabelled as current proof.
Qualified candidate — 2026-10-15
Ready run 38795496667, attempt 1, passes all 13 selected jobs, including the aggregate. Packaging is intentionally unselected for this tests-only contribution. Every executed job checkout log identifies
9c685b6de9b3828e119a9e7d4feb0dff1ff21696, parents maind9ac37b82700d7b45406ba47c0850ae46251fa9band head76d7b1d338fc7602dd41b1d81ad14ce74b047b4e, tree504b56199bd2bfc8eb7af213883234e009fa7d7e; immutable API and fetched Git agree. No failed suite was retried.Unit job 116630958542 passes all 14 continuity cases, including the four new late-history cases, all three snapshot races, both ten-drop paths and both IME paths. The unchanged ten-minute endurance scenario passes in 603.539 seconds. Total executed CI job-wall cost is 8,134 seconds, event-to-completion 1389 seconds; the preceding cheap draft run adds 49 job-seconds. Separate project/contract workflows are outside that accounting. These are qualification costs, not matched performance gains.
Main then advanced independently through #1963 to
838f05d2ff611c72bdea8405c46f2504dccb6f24. Its four-file native event observer correction is separately qualified by all 14 selected jobs in run 38793661631. It changes no continuity source, fixture, product, dependency, preload, workflow or sharding implementation. Its hosted-app observer and additional unit file are different full-suite inputs, so the older run is not relabelled as proof of that combined tree. Under the unrelated-advancement rule, retain the tested base above and verify the actual squash parent/tree and automatic main run separately. The expected merge tree on that live base is022e382887684a7315c51e796eeb7264458a79c6.Actual main verification — 2026-10-15
#1961 is merged as
1cc1b34a802f0894391b9bb445fed39fed610230. Its actual parent is838f05d2ff611c72bdea8405c46f2504dccb6f24and tree is022e382887684a7315c51e796eeb7264458a79c6, matching the reviewed prospective combined state; immutable GitHub and local Git agree.Automatic push run 38798781662, attempt 1 passes all 13 selected jobs, including the aggregate. Every executed checkout log identifies that exact squash. Packaging is intentionally unselected for this tests-only delivery. Unit job 116642311946 passes all 14 continuity cases, with the exact same named set as ready qualification. All original product assertions, late-history cases and retained final observation windows remain. Layout job 116642311865 passes the unchanged native endurance case in 604.257 seconds: 588 chunks, 9,665,247 bytes, saved through 599.765 seconds and decoded duration 599.699977 seconds.
Main validation consumed 7,842 summed job-wall seconds and 1,487 seconds from event creation to last job completion. The separate ready run cost 8,134 job-seconds / 1,389 event seconds, and its preceding cheap draft cost 49 job-seconds: 16,025 executed CI job-seconds for these three events. Separate contract/project workflows, local commands and engineering time are excluded. The four newly timed local fault/restoration/type/preflight commands cost 174.86 seconds wall / 245.99 seconds CPU. These are verification costs; neither different-source CI timings nor the integrated restoration run is a matched speedup experiment. Historical per-slice gains and rejected-study costs retain their original identities in the PR.
This completes the partial four-slice delivery. #1855 stays open for justified remaining temporal horizons and its #1956/#1854 dependencies. The fifth observer remains withdrawn, with its original evidence preserved. The fresh main pass does not diagnose or waive #1993's separate #1962 qualification failure. No failed job was retried and no merged branch was pushed. PR and advanced issue retain milestone 0.44.0 (58); the issue is open and unassigned.
Checklist
Anything left open
#1855 remains open. The three restored final snapshot windows and every retained scene window still need a justified temporal horizon or a simpler fault-sensitive completion design; preservation is not completion. #1956 concerns the separate local scene-upload prerequisite, and #1854 owns execution-tier policy. #1915 is resolved by #1979. Complete selected candidate proof passes as recorded above; final combined main proof passes and is separately attributed above. #1993 remains an independent open native Playwright investigation; it is not claimed repaired by this PR and any required candidate failure still needs diagnosis. Prior-head native or cheap draft passes are not substitutes.