Make each work plan task a commit-sized unit - #187
Merged
Merged
Conversation
Work plans could split changes that only pass the repository's commit checks together into separate tasks. The observable verification point was defined at both task and phase level, so a phase could act as the real commit unit while its tasks became non-committable fragments, and the undefined rollback boundary field let plans record "phase commit set" as a task boundary. Remove the phase-level verification point, the slice-shape guidance in the plan template (duplicated from implementation-approach), and the rollback boundary field that no downstream step consumed. Tie the task verification point to the repository's commit-time checks, and align the task-decomposer description with its one-to-one mapping. Bump the patch version to 0.27.4. Co-Authored-By: Claude Opus 5.5 (1M context) <noreply@anthropic.com>
This file contains hidden or bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
Add this suggestion to a batch that can be applied as a single commit.This suggestion is invalid because no changes were made to the code.Suggestions cannot be applied while the pull request is closed.Suggestions cannot be applied while viewing a subset of changes.Only one suggestion per line can be applied in a batch.Add this suggestion to a batch that can be applied as a single commit.Applying suggestions on deleted lines is not supported.You must change the existing code in this line in order to create a valid suggestion.Outdated suggestions cannot be applied.This suggestion has been applied or marked resolved.Suggestions cannot be applied from pending reviews.Suggestions cannot be applied on multi-line comments.Suggestions cannot be applied while the pull request is queued to merge.Suggestion cannot be applied right now. Please check back later.
Summary
Work plans could split changes that only pass the repository's commit checks together into separate tasks. The per-task commit cycle then could not commit those tasks one by one.
This PR fixes it mostly by removing rules. It adds one clause.
Changes
work-planner.md,plan-template.md). The verification point now exists only at task level, so a phase can no longer act as the real commit unit while its tasks are fragments.plan-template.md. It duplicatedimplementation-approach.Rollback boundaryfield from the planner, the decomposer, and both templates. No downstream step read it.task-decomposerdescription now matches its one-to-one mapping.Also included: the patch version is bumped to 0.27.4, and the plugin copies are synced.
Verification
I ran work-planner → task-decomposer with