Repository navigation
docs: record phase 3 closeout status in the product plan - #852
Merged
Merged
Conversation
Refresh current status lines after PRs 829-850: telemetry exporter merged with its live preview join, MCP preview idle and host execute interruption proof with remaining cancellation unknowns, released CLI preview proof at PR 833, the phase 3 paid inference, the draft regression fix and the chat idle bound. Qualify the Preview Stop statement against the later MCP trace, add the 60s idle production watch item, and record the held scenarios pair and pre-810 production state.
This file contains hidden or bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
Add this suggestion to a batch that can be applied as a single commit.This suggestion is invalid because no changes were made to the code.Suggestions cannot be applied while the pull request is closed.Suggestions cannot be applied while viewing a subset of changes.Only one suggestion per line can be applied in a batch.Add this suggestion to a batch that can be applied as a single commit.Applying suggestions on deleted lines is not supported.You must change the existing code in this line in order to create a valid suggestion.Outdated suggestions cannot be applied.This suggestion has been applied or marked resolved.Suggestions cannot be applied from pending reviews.Suggestions cannot be applied on multi-line comments.Suggestions cannot be applied while the pull request is queued to merge.Suggestion cannot be applied right now. Please check back later.
Updates the current status lines in
docs/plans/product-structure.md(and one sentence indocs/preview-deploys.md) to match what PRs 829–850 actually merged and proved. Markdown only, so no runtime gate orlocal-ciwas run. Historical sections of the plan are unchanged.Stale status corrected
pnpm dbreader. Records the live preview join: 33 complete v1 rows joined to the Gateway log and the stored artifact, which Fable confirmed separately. Line 205 no longer says DuckDB blocks correlation.execute24 ms after the fetch abort (trace64ffa952…). The 810 "no regression" triage is now dated to 810, followed by the later confirmed session regression and its fix. The session alarm is deleted, andmcp-v1never reached production.put; Create still makes separate writes.2b4ad29d(pre-810). Adds a Studio Stop and idle-bound step and the 60 s idle watch item.Known limits kept
Signed-in persistence, historical stored data, R2 write ambiguity, bundle/cold-start and RSS performance, remote sandbox termination, and pre-810/production MCP cancellation equivalence all stay open. Named gaps also stay: native CLI, quota DO KV, telemetry isolate-loss/hung-request memory/late callbacks, and provider parity. The released CLI was not rerun after #833, and nothing from phase 3 is in production.
Held scenarios pair
A new "Phase 3 status" paragraph says the scenarios move (#851
e384a562+ shpitdev/frontierclimb#28183ec4eb3) is accepted but held, and that main keepspackages/diagram/scenarios. This PR is separate from that pair and goes ahead of it. Agit merge-treeof #851 over this head merges cleanly, and the shared 60 s checklist line appears once. When #851 lands, the status paragraph needs a one-line update.Draft; not for merge by this author.