Repository navigation
feat(stovepipe): Wire the project analysis stage - #1065
Draft
prathshenoy wants to merge 1 commit into
Draft
prathshenoy wants to merge 1 commit into
prathshenoy wants to merge 1 commit into
Conversation
This was referenced Nov 9, 2026
prathshenoy
force-pushed
the
prath.shenoy/feat/stovepipe-project-analysis-wiring
branch
from
November 10, 2026 15:42
af15e62 to
7ea0407
Compare
prathshenoy
force-pushed
the
prath.shenoy/feat/stovepipe-project-analysis-wiring
branch
from
November 10, 2026 16:27
7ea0407 to
ef261e4
Compare
1 task done
prathshenoy
force-pushed
the
prath.shenoy/feat/stovepipe-project-analysis-wiring
branch
2 times, most recently
from
November 10, 2026 17:04
056eb27 to
e9309c3
Compare
prathshenoy
force-pushed
the
prath.shenoy/feat/stovepipe-project-analysis-wiring
branch
from
November 10, 2026 17:08
e9309c3 to
485d3b1
Compare
prathshenoy
force-pushed
the
prath.shenoy/feat/stovepipe-project-analysis-wiring
branch
from
November 10, 2026 17:13
485d3b1 to
73696e4
Compare
prathshenoy
force-pushed
the
prath.shenoy/feat/stovepipe-project-analysis-wiring
branch
from
November 10, 2026 17:55
73696e4 to
cfe1551
Compare
prathshenoy
force-pushed
the
prath.shenoy/feat/stovepipe-project-analysis-wiring
branch
2 times, most recently
from
November 10, 2026 21:17
070b536 to
406f777
Compare
prathshenoy
force-pushed
the
prath.shenoy/feat/stovepipe-project-analysis-wiring
branch
from
November 10, 2026 21:21
406f777 to
c57d38d
Compare
prathshenoy
force-pushed
the
prath.shenoy/feat/stovepipe-project-analysis-wiring
branch
from
November 10, 2026 21:31
c57d38d to
3b850df
Compare
prathshenoy
force-pushed
the
prath.shenoy/feat/stovepipe-project-analysis-wiring
branch
from
November 10, 2026 21:42
3b850df to
a96159e
Compare
prathshenoy
force-pushed
the
prath.shenoy/feat/stovepipe-project-analysis-wiring
branch
2 times, most recently
from
November 10, 2026 21:52
9709f62 to
ba03173
Compare
prathshenoy
force-pushed
the
prath.shenoy/feat/stovepipe-project-analysis-wiring
branch
from
November 10, 2026 22:15
ba03173 to
08dbfb2
Compare
prathshenoy
force-pushed
the
prath.shenoy/feat/stovepipe-project-analysis-wiring
branch
2 times, most recently
from
November 10, 2026 23:14
1556bc3 to
eb2ea69
Compare
prathshenoy
changed the base branch from
prath.shenoy/feat/stovepipe-project-completion
to
prath.shenoy/feat/stovepipe-project-analysis-dlq
November 10, 2026 23:23
prathshenoy
force-pushed
the
prath.shenoy/feat/stovepipe-project-analysis-wiring
branch
from
November 10, 2026 23:23
eb2ea69 to
4504f5f
Compare
prathshenoy
added a commit
that referenced
this pull request
Nov 10, 2026
## Summary **What**: - Run project analysis after terminal build analysis and before repository recording. - Mark project analysis finished after project statuses and issue attribution are recorded, or processing is abandoned. **Why**: - Ensure attribution uses final build issues and repository recording receives the project results needed to distinguish partial failures from repository-wide failures. - Keep request summaries from reporting completion while project analysis is still running, and repair incomplete summary updates before handing off to repository recording. ## Test Plan - [x] Add unit tests. ## Revert Plan - Revert this PR after pausing intake and draining or reconciling pending project-analysis work, because the revert removes its consumers. ## Issue Links - [CODEM-632](https://linear.app/uber/issue/CODEM-632/projects-issues) ## Stack 1. #1057 1. #1066 1. #1058 1. #1062 1. #1065
## Summary **What**: - Run project analysis after terminal build analysis and before repository recording. - Mark project analysis finished after project statuses and issue attribution are recorded, or processing is abandoned. **Why**: - Ensure attribution uses final build issues and repository recording receives the project results needed to distinguish partial failures from repository-wide failures. - Keep request summaries from reporting completion while project analysis is still running, and repair incomplete summary updates before handing off to repository recording. ## Test Plan - [x] Add unit tests. ## Revert Plan - Revert this PR after pausing intake and draining or reconciling pending project-analysis work, because the revert removes its consumers. ## Issue Links - [CODEM-632](https://linear.app/uber/issue/CODEM-632/projects-issues) ## Stack 1. #1057 1. #1066 1. #1058 1. #1062 1. #1065
prathshenoy
force-pushed
the
prath.shenoy/feat/stovepipe-project-analysis-wiring
branch
from
November 10, 2026 23:36
4504f5f to
65d8709
Compare
This branch has not been deployed
This file contains hidden or bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
Add this suggestion to a batch that can be applied as a single commit.This suggestion is invalid because no changes were made to the code.Suggestions cannot be applied while the pull request is closed.Suggestions cannot be applied while viewing a subset of changes.Only one suggestion per line can be applied in a batch.Add this suggestion to a batch that can be applied as a single commit.Applying suggestions on deleted lines is not supported.You must change the existing code in this line in order to create a valid suggestion.Outdated suggestions cannot be applied.This suggestion has been applied or marked resolved.Suggestions cannot be applied from pending reviews.Suggestions cannot be applied on multi-line comments.Suggestions cannot be applied while the pull request is queued to merge.Suggestion cannot be applied right now. Please check back later.
Summary
What:
Why:
Test Plan
Revert Plan
Issue Links
Stack